From the transformer plant for the metallurgical one

Two units of equipment were shipped to the Chelyabinsk region.

Transformers TRDN-63000/110 were shipped from the Ufa site of the ERSO Holding for the Ashinsky Metallurgical Plant (AMET), where a large-scale updating of the sheet rolling shop is going on. The equipment is designed to provide the site with reliable power supply.

The Ashinsky Metallurgical Plant was built in 1898. At the present time it is one of the five leading suppliers of hot-rolled plate products made of carbon, low-alloy, structural and alloy steel grades.